Brandon, P S and Ribeiro, F L (1998) A knowledge-based system for assessing applications for house renovation grants. Construction Management and Economics, 16(01), 57-69.

Chau, K W, Raftery, J and Walker, A (1998) Note - The baby and the bathwater: research methods in construction management. Construction Management and Economics, 16(01), 99-104.

Chinyio, E A, Olomolaiye, P O, Kometa, S T and Harris, F C (1998) A needs-based methodology for classifying construction clients and selecting contractors. Construction Management and Economics, 16(01), 91-8.

Dawood, N N (1998) Estimating project and activity duration: a risk management approach using network analysis. Construction Management and Economics, 16(01), 41-8.

Edwards, P J and Bowen, P A (1998) Practices, barriers and benefits of risk management process in building services cost estimation: comment. Construction Management and Economics, 16(01), 105-8.

Harriss, C (1998) Why research without theory is not research: a reply to Seymour et al.. Construction Management and Economics, 16(01), 113-6.

Kumaraswamy, M M and Chan, D W M (1998) Contributors to construction delays. Construction Management and Economics, 16(01), 17-29.

McDonald, B and Smithers, M (1998) Implementing a waste management plan during the construction phase of a project: a case study. Construction Management and Economics, 16(01), 71-8.

Noyce, D A and Hanna, A S (1998) Planned and unplanned schedule compression: the impact on labour. Construction Management and Economics, 16(01), 79-90.

Ranasinghe, M (1998) Risk management in the insurance industry: insights for the engineering construction industry. Construction Management and Economics, 16(01), 31-9.

Seymour, D E, Rooke, J D and Crook, D (1998) The role of theory in construction management: reply to Runeson. Construction Management and Economics, 16(01), 109-12.

Tam, C M and Fung, I W H (1998) Effectiveness of safety management strategies on safety performance in Hong Kong. Construction Management and Economics, 16(01), 49-51.

Wang, C-H and Huang, Y-C (1998) Controlling activity interval times in LOB scheduling. Construction Management and Economics, 16(01), 5-16.